Maple Leaf Square - Tower 2
Access Maple Leaf Square - Tower 2 Sales Office
|
|||||||||||
Approximate Address - 15 York Street [map]
City - Toronto, Ontario, Canada
Region - Greater Golden Horseshoe
Complex - Maple Leaf Square
Complex Buildings - Tower 1
Nearby Buildings - Oakdale Professional Centre, Holiday Inn Express, Travelodge North York, 2970 Jane Street, 2999 Jane Street, 25 San Romanoway, Humber River Regional Hospital - Finch, 100 York Gate Boulevard, 10 San Romanoway, 5 San Romanoway
Type - Skyscraper
Designation - Commercial, Condominium, Office
Status - Construction
Height - 174m571feet
Floors - 50 above ground and 1 below ground
Units - 404 suites
Advertising - Montana Steele Advertising
Architect - Kuwabara Payne McKenna Blumberg Architects
Architect - Page & Steele Architects Inc.
Construction Manager - PCL Constructors Inc.
Developer - Cadillac Fairview
Developer - Lanterra Developments
Developer - Maple Leaf Sports & Entertainment
Drainage Contractor - The Atlas Corporation
Electrical Engineering - Hidi Rae Consulting Engineers
Elevator Contractor - Otis Canada Inc
Elevator Contractor - ThyssenKrupp Elevator Can Ltd
Excavating Contractor - Michael Bros Excavating
Foundation Contractor - Anchor Shoring & Caissons Ltd
GeoEnvironmental Consultant - McClymont & Rak Engineers, Inc.
Glass/Glazing Contractor - Flynn Canada
Interior Design - Munge//Leung Interior Design
Landscape Architect - Greg Smallenberg
Masonry Contractor - Aliance Construction Ltd
Mechanical Engineering - Hidi Rae Consulting Engineers
Reinforcing Steel Contractor - Salit Steel Niagara Ltd
Siding Contractor - Flynn Canada
Structural Engineering - Jablonsky, Ast and Partners
2007-12-12
2007-09-24
2007-08 - Construction
2007-04-19
2006-12-29 - Excavation
2005-04-19 - Proposed
Contributors: Rod Taylor
"Maple Leaf Square, 15 York St, M5J". (2007, 19 July). Reed Construction Data - KeyMail Report.
Project: cast-in-place concrete structural frame, fuel fired heating system, precast, curtainwall and windowwall cladding; 23 elevators; gypsum board interior walls and ceilings; millwork; cabinetry; various floor finishes; tile; marble; proposed const of a multi-use complex including; two condominium towers consisting of 872 units, a boutique hotel, a 2000 seat concert hall, a fine dining restaurant , a high-tech sports bar, 17,000 sq ft of retail, a public square and a glass walkway to link the complex to the Air Canada Centre.
Scope: 106,385 m²; 48 storeys; 1 storey below grade; 2 structures; 872 units; parking for 850 cars; 8,477 m²
Owner: The Cadillac Fairview Corp Ltd
Owner: Maple Leaf Sports & Ent. Ltd.
Owner: Lanterra Developments
Excavating cont: Michael Bros Excavating
Drainage cont: The Atlas Corporation
Foundation cont: Anchor Shoring & Caissons Ltd
Reinforcing steel cont: Salit Steel (Niagara) Ltd
Masonry cont: Aliance Construction Ltd
Siding cont: Flynn Canada (Toronto)
Glass, glazing cont: Flynn Canada (Toronto)
Elevator cont: Otis Canada
Elevator cont: Thyssen Krupp Elevator
Const manager: PCL Const Canada Inc
Architect: KPMB Architects
Architect: Page & Steele Inc
Structural cons eng: Jablonsky Ast & Partners
Mechanical cons eng: Hidi Rae Consulting Eng Inc
Electrical cons eng: Hidi Rae Consulting Eng Inc
"Maple Leaf Square, 15 York St, M5J". (2007, 24 January). Reed Construction Data - KeyMail Report.
Scope: 106,385 m²; 54 storeys; 1 storey below grade; 2 structures; 872 units; parking for 850 cars; 8,477 m²
Owner: The Cadillac Fairview Corp Ltd
Owner: Lanterra Developments
Owner: Maple Leaf Sports & Ent. Ltd.
Const manager: PCL Const Canada Inc
Architect: KPMB Architects
Architect: Page & Steele Inc
Structural cons eng: Jablonsky Ast & Partners
Mechanical cons eng: Hidi Rae Consulting Eng Inc
Electrical cons eng: Hidi Rae Consulting Eng Inc
Harness, Allison. (2006, 23 January). "Flurry of building west of Yonge St". Toronto Star.
THE RESIDENCES OF MAPLE LEAF SQUARE: Southeast corner of York St. and Bremner Blvd. Two buildings: 54 storeys with 440 units and 50 storeys with 404 units. Fees: 45 cents per sq. ft., plus heat and hydro. Amenities: indoor and outdoor pools, party room, home theatre, steam rooms, hot tub, exercise facility, 24-hour concierge, lounge, business centre with boardroom, rooftop terrace. Sales: Phase 1, 85 per cent sold. Status: construction to start this fall. Occupancy: October 2009.
"MLSE, Cadillac Fairview & Lanterra Unveil Major Dowtown Development". (2005, 19 April). torontomapleleafs.com.
Maple Leaf Sports & Entertainment (MLSE), The Cadillac Fairview Corp. Ltd. and Lanterra Developments announced Tuesday that the three companies have joined together to develop Maple Leaf Square - a premier entertainment destination to be located in downtown Toronto. The $350 million development will create more than 1,700 construction jobs and approximately 500 full and part-time positions when Maple Leaf Square is completed. Details of the new development were unveiled at a news conference at Air Canada Centre.
Adjacent to the very successful Air Canada Centre, Maple Leaf Square will be the place to visit, play and stay for both Torontonians and tourists and will include both a fine dining and high-tech sports-themed restaurant, a sports and entertainment themed boutique hotel, two condominium towers, a music club, office space, a high-definition broadcast studio and a 170,000 square foot retail space anchored by a 9,000 square foot Leafs, Raptors and Marlies store.
Toronto Mayor David Miller said "Maple Leaf Square is an important part of this city's ongoing transformation. Not only have the three companies leading this development earned tremendous respect within their industries, they have also demonstrated a real commitment to city building."
Many well-known and respected consultants have been recruited for the development of Maple Leaf Square including architects Bruce Kuwabara and Shirley Blumberg of Kuwabara, Payne, McKenna and Blumberg (KPMB) and Sol Wasermuhl and Vlad Losner of Page + Steele, as well as landscape architect Greg Smallenberg who will oversee the aesthetics of the project.
"Final Report" [1.32MB]. City Hall.
"Preliminary Report" [808.43kB]. City Hall.
"Staff Report". City Hall.