Identification
Approximate Address -
5145 Dundas Street West [map]
City -
Toronto, Ontario, Canada
Region -
Greater Golden Horseshoe
Complex -
Six Points
Complex Buildings -
Village Gate West - Tower 2, Village Gate West - Tower 3b, Village Gate West - Serrano
Nearby Buildings -
2 Dunbloor, Palais, 5005 Dundas Street West, 57 Mabelle Avenue, 3631 Bloor Street West, Mabelle Place, Islington Manor, The Essex - West Tower, Bell Building, Network Lofts
Technical
Type - High-Rise
Designation - Residential
Status - Proposed
Floors -
24
Companies
Architect -
Page & Steele Architects Inc.
Developer -
Concert Properties Ltd.
Electrical Engineering -
M V Shore Associates Ltd.
General Contractor -
Deltera Inc.
Mechanical Engineering -
M V Shore Associates Ltd.
Structural Engineering -
Jablonsky, Ast and Partners
Building Record History
- Proposed
Reference Material
Contributors: Mark Simpson, Rod Taylor, Tipharah Lavigne
"Village Gate West, Phase Three, 5145 Dundas St W, M9A 1C1". (2007, 4 December). Reed Construction Data.
Project: proposed const of two rental apartment buildings. The number of units will range between 450 and 500 and has yet to be finalized. Construction of phase one and phase two can be followed under RCD report numbers 9038838 and 9038848 respectively.
Scope: 500,000 square feet; 24 storeys; 2 structures; 500 units
Owner: Concert Properties Ltd
Gen cont: Deltera Inc
Architect: Page & Steele Inc
Structural cons eng: Jablonsky Ast & Partners
Mechanical cons eng: M V Shore Associates 1993Ltd
Electrical cons eng: M V Shore Associates 1993Ltd
"CONDO APT BLDGS - Village Gate West -Phase Three, 5145 Dundas St W". (2006, 12 October). Reed Construction Data - Keymail report.
Note: Project is preliminary. Design, tender and construction schedules are being finalized.
Project: proposed const of two condo bldgs comprising up to 500 units.
Owner: Concert Properties Ltd
Architect: Page & Steele Inc
"Concert Press Release". Accessed 14 Sep 05.
"Final Report" [1.75MB]. (2003, 26 May). Toronto City Hall.
|