Anchor Shoring & Caissons Ltd

Structures 1 to 14 out of 14
Type Name Status Floors Height
  
1
Building 1 Bloor East Never Built (2009) 80 265.45 Meters
Building Archives of Ontario Proposed (2006) 7
Complex Centro Proposed (2007) 31
Cluster Concord Park Place Proposed (2004)
Building Concord Park Place - Discovery Construction (2009) 28
Building Concord Park Place - Discovery II Construction (2009) 28
Building First Waterfront Place Construction (2008) 8
Complex Maple Leaf Square
Building Maple Leaf Square - North Structure Construction (2007-08) 54 186.00 Meters
Building Maple Leaf Square - South Structure Construction (2007-08) 50 174.00 Meters
Building Shangri-La Construction (2009-06-27) 66 210.00 Meters
Building South Beach Condos and Lofts 1 Proposed (2008) 27
Building South Beach Condos and Lofts 2 Proposed (2008) 27
Building The Village by High Park Proposed (2008-03-05) 16