Cresford Developments

Structures 1 to 18 out of 18
Type Name Status Floors Height
  
1
Building 76 Shuter Complete (2008) 15
Building Bloor Street Neighbourhood Construction (2007-05) 32
Building Boot - Tower 1 Complete (2003) 12
Building Casa Condominio Residenza Complete (2010) 45 138.00 Meters
Building Lofts 399 Site Preparation (2008) 10
Cluster Merchandise Building Cluster
Building Merton Yonge Condominiums Proposed (2007) 25 83.50 Meters
Building NXT at Windermere by the Lake Construction (2009) 25 92.00 Meters
Cluster Quad Lofts
Building Quad Lofts - East Structure Complete (2006) 9
Building Quad Lofts - West Structure Complete (2006) 12 44.00 Meters
Building Stratford in Lawrence Park 1 Never Built (2009) 5
Building Stratford in Lawrence Park 2 Never Built (2009) 5
Building Stratford in Lawrence Park 3 Never Built (2009) 4
Cluster Thornwood
Building Thornwood - South Tower Complete (2004-03) 13 42.90 Meters
Cluster Windermere by the Lake
Building Windermere by the Lake 1 Complete (2006) 28

©Copyright 2005-2010 Rod Taylor d.b.a. UrbanDB, All Rights Reserved

This data is provided for reference purposes only. While care has been taken to ensure accuracy, UrbanDB will not be liable for the misuse of information, facts, details, or any other elements, or for deficiencies, defects, errors, or omissions in the content of this data.