MCW Consultants Ltd.

Structures 1 to 25 out of 25
Type Name Status Floors Height
  
1
Complex 100 Yorkville Proposed (2004)
Building 100 Yorkville - Tower 2 Complete (2009) 8 28.00 Meters
Building 77 Charles West Proposed (2004-09-12) 16 61.90 Meters
Building 80 Yorkville - Tower 1 Complete (2009) 17 61.60 Meters
Building Burano Construction (2010) 48 158.00 Meters
Building Canad Inns Proposed 16
Cluster Concord Park Place Proposed (2004)
Building Concord Park Place - Discovery Construction (2009) 28
Building Concord Park Place - Discovery 2 Construction (2009) 28
Building Concord Park Place - Phase 2, Discovery Building D Excavation (2008) 12
Building Concord Park Place - Phase 2, Discovery Building E Excavation (2008) 12
Building Emerald Proposed (2008) 15
Cluster Emerald City
Building Emerald City - Structure 2 Construction (2009) 36
Building M5VLife Construction (2009) 35 119.50 Meters
Cluster Parkway Forrest Proposed (2008)
Building The Avenue Construction (2007-11-08) 19
Complex The Huntington Proposed (2006)
Cluster The Republic
Building The Republic North Construction (2008) 24 79.50 Meters
Building The Republic South Construction (2008) 27 86.00 Meters
Cluster Tweedsmuir and St Clair
Building Tweedsmuir and St Clair 1 Proposed (1999) 30
Building Tweedsmuir and St Clair 2 Proposed (1999) 30
Building Tweedsmuir and St Clair 3 Proposed (1999) 9

©Copyright 2005-2010 Rod Taylor d.b.a. UrbanDB, All Rights Reserved

This data is provided for reference purposes only. While care has been taken to ensure accuracy, UrbanDB will not be liable for the misuse of information, facts, details, or any other elements, or for deficiencies, defects, errors, or omissions in the content of this data.