Michael Bros Excavating

Structures 1 to 9 out of 9
Type Name Status Floors Height
  
1
Building Burano Construction (2010) 48 158.00 Meters
Complex Maple Leaf Square
Building Maple Leaf Square - North Structure Construction (2007-08) 54 186.00 Meters
Building Maple Leaf Square - South Structure Construction (2007-08) 50 174.00 Meters
Building Nautilus at Waterview Construction 39 122.00 Meters
Building Railway Lands - Block 32 Proposed (2006) 35 62.00 Meters
Building Solstice Condominiums Complete (2008-06-01) 35
Building The Uptown Residences Construction (2008) 48 158.00 Meters
Building Zip Condos and Lofts Complete (2008-12) 25

©Copyright 2005-2010 Rod Taylor d.b.a. UrbanDB, All Rights Reserved

This data is provided for reference purposes only. While care has been taken to ensure accuracy, UrbanDB will not be liable for the misuse of information, facts, details, or any other elements, or for deficiencies, defects, errors, or omissions in the content of this data.