Mike Niven Interior Design Inc.

Structures 1 to 55 out of 55
Type Name Status Floors Height City
Building Studio2 Construction 41 Toronto
Building Verve Complete 39 Toronto
Building The Regency Yorkville Complete 18 Toronto
Building King + Condos Construction 17 Toronto
Building Sherway Gardens - Structure 1 Complete 32 Toronto
Building Ultra - Structure 2 Complete 5 Toronto
Building Metro Gate Community Phase Four Proposed 12 Toronto
Building Luna - Structure 1 Registered 38 Toronto
Building Bravo Construction 19 Toronto
Building The Palm Construction 23 Toronto
Building Legacy at Heron's Hill Registered 25 Toronto
Building One Sherway - Structure 2 Complete 27 Toronto
Building Twenty-One Clairtrell Construction 7 Toronto
Building Jade Lofts Never Built 12 Toronto
Building E Condos - Structure 2 Site Preparation 58 Toronto
Building Bliss Registered 20 Toronto
Building Liberty Towers Registered 25 Toronto
Building Parade - Structure 3 Complete 43 Toronto
Building Ventus - Structure 2 Registered 19 Toronto
Building The Clairmont Complete 14 Toronto
Building E Condos - Structure 1 Site Preparation 36 Toronto
Building iLoft Complete 30 Toronto
Building The 6th Proposed 8 Markham
Building California Condos Complete 30 Toronto
Building North Shore - Structure 1 Construction 22 Mississauga
Building Couture Complete 42 Toronto
Building Scenic III Construction 18 Toronto
Building The Modern on Richmond Registered 17 Toronto
Building Emporium - South Structure Complete 8 Oakville
Building The Tides Complete 22 Toronto
Building Metrogate - Solaris I Registered 40 Toronto
Building San Francisco By the Bay - Structure 1 Complete 16 Pickering
Building Malibu at Harbourfront Complete 32 Toronto
Building The Met Complete 43 Toronto
Building Angus Glen - Structure 1 Proposed 8 Markham
Building ARC Complete 15 Toronto
Building Reflections Construction 12 Toronto
Building Scenic on Eglinton - East Structure Construction 16 Toronto
Building Angus Glen - Structure 2 Proposed 8 Markham
Building One Sherway - Structure 3 Construction 28 Toronto
Building The Bell Festival Centre Registered 42 Toronto
Building Ventus - Structure 1 Complete 30 Toronto
Building Ultra Complete 38 Toronto
Building 87 Peter Proposed 48 Toronto
Building Studio Condominiums - North Structure Construction 31 Toronto
Building Panorama Registered 28 Toronto
Building Liv Lofts Reconstruction 15 Toronto
Building Emporium - North Structure Construction 8 Oakville
Building The Savoy at Camelot Complete 8 Toronto
Building 9T6 Complete 18 Toronto
Building Scenic on Eglinton - West Structure Construction 12 Toronto
Building Red Hot Condos Registered 9 Toronto
Building Encore at The Met Complete 33 Toronto
Building North Shore - Structure 2 Construction 6 Mississauga
Building One Sherway - Structure 4 Construction 24 Toronto