Priestly Demolition Inc.

Structures 1 to 7 out of 7
Type Name Status Floors Height
  
1
Building 1 Bloor East Never Built (2009) 80 265.45 Meters
Building Bliss Construction (2009) 20
Building First Waterfront Place Construction (2008) 8
Building Liberty Towers Construction (2009) 25
Building Sears Canada Reconstruction (2010-03) 9
Building The Dunfield Construction (2008) 17
Cluster YWCA - Edward Street Proposed (2006)