Stantec Consulting Ltd.

Structures 1 to 22 out of 22
Type Name Status Floors Height
  
1
Building 1120 East 7th Proposed (2006) 7 31.40 Meters
Building 205 8th Avenue Proposed 6
Building Atira Women's Resource Society Proposed 9
Building Bow Valley College - Phase Two Proposed (2005) 7
Complex BridgePoint Health Proposed (2002)
Building Bridgepoint Health - Don Jail Reconstruction 11
Complex Calgary City Centre Complex
Building Earth Systems Science Building Proposed (2008) 5
Building First Waterfront Place Construction (2008) 8
Complex Fusion Plaza Proposed (2008)
Building Gateway Green Proposed 15
Building George Brown College - Building 2 Complete 8
Building George Brown College - Waterfront Campus Site Preparation (2009) 8
Building Krembil Discovery Centre 9 60.90 Meters
Building Lookout Emergency Aid Society Proposed (2008) 12 38.00 Meters
Building NYGH Branson - Tower 1 Proposed (2004-11) 21
Building Residences at The Ritz Carlton Construction (2008-01-09) 66
Building Shangri-La Construction (2009-06-27) 66 210.00 Meters
Building The Edmonton Clinic - North Proposed (2006) 7
Complex The Hudson Proposed (2006)
Building Vancouver Convention Centre Construction (2007) 3
Building Westin Kelowna Proposed (2005) 20

©Copyright 2005-2010 Rod Taylor d.b.a. UrbanDB, All Rights Reserved

This data is provided for reference purposes only. While care has been taken to ensure accuracy, UrbanDB will not be liable for the misuse of information, facts, details, or any other elements, or for deficiencies, defects, errors, or omissions in the content of this data.