Stephenson Engineering Ltd.

Structures 1 to 24 out of 24
Type Name Status Floors Height
  
1
Building 144 Park Proposed (2009)
Building 21 John Street Excavation (2006-09) 15
Building 400 Wellington West Excavation (2010) 12
Building First Meadowvale Corporate Centre Proposed 10
Complex Four Seasons Private Residence Construction
Cluster Four Seasons Yorkville
Building Four Seasons Yorkville Hotel 2a Construction (2009-01) 55 195.00 Meters
Building Four Seasons Yorkville Hotel 2b Construction (2009-01) 25 89.00 Meters
Cluster Heron's Hill
Building Legacy at Heron's Hill Construction (2008) 25
Building Liberty Market Lofts Proposed (2008-04) 7 13.00 Feet
Building Lumiere Construction (2008) 30
Building Nautilus at Waterview Construction 39 122.00 Meters
Complex One Sherway Construction
Cluster Opera Place
Building Pickering Parkway Proposed (2009) 7
Building Telus Building Complete (2010) 30 136.09 Meters
Cluster The Marquee
Cluster Tweedsmuir and St Clair
Building Tweedsmuir and St Clair 1 Proposed (1999) 30
Building Tweedsmuir and St Clair 2 Proposed (1999) 30
Building Tweedsmuir and St Clair 3 Proposed (1999) 9
Building Ultra Construction (2009) 30
Building Waterscape - Phase 2 Proposed 12

©Copyright 2005-2010 Rod Taylor d.b.a. UrbanDB, All Rights Reserved

This data is provided for reference purposes only. While care has been taken to ensure accuracy, UrbanDB will not be liable for the misuse of information, facts, details, or any other elements, or for deficiencies, defects, errors, or omissions in the content of this data.