| Accolade |
|
Registered (2010-08) |
|
34 |
| Yonge Eglinton Centre - East Structure |
|
Proposed Reconstruction (2009) |
124.00 Meters |
30 |
| Living Life on the Avenue |
|
Complete (2011) |
20.00 Meters |
7 |
| St. Regis |
|
Complete |
|
7 |
| The Bayview Terraced Condominium Residences |
|
Complete |
|
9 |
| 190 Colin |
|
Complete |
|
5 |
| Glenyan Manor |
|
Complete |
|
7 |
| 321 Chaplin Cresent |
|
Complete |
|
8 |
| Scenic on Eglinton - West Structure |
|
Construction (2011) |
|
12 |
| Minto Roehampton |
|
Complete (2007) |
44.25 Meters |
16 |
| Scenic on Eglinton - East Structure |
|
Construction (2011) |
|
16 |
| Canada Square |
|
Complete (1963) |
|
17 |
| Kilgour Estates - Structure 2 |
|
Complete (2007) |
|
7 |
| Prince Charles Terrace |
|
Complete |
|
6 |
| Reflections |
|
Construction (2011) |
|
12 |
| Kodak Canada |
|
Complete |
|
5 |
| Residences at the Don Mills Centre Phase Three - A1 |
|
Proposed (2009) |
|
12 |
| Residences at the Don Mills Centre Phase Three - A2 |
|
Proposed (2009) |
|
12 |
| Neon |
|
Construction (2012) |
|
24 |
| Scenic III |
|
Construction (2013) |
|
18 |
| Yonge and Eglinton |
|
Proposed (2006) |
|
|
| The Hill |
|
Proposed (2011) |
|
9 |
| Canterbury |
|
Proposed (2012) |
|
3 |
| E Condos - Structure 1 |
|
Site Preparation (2014) |
|
36 |
| E Condos - Structure 2 |
|
Site Preparation (2014) |
|
58 |
| Flaire Condominiums - Structure 3 |
|
Proposed (2009) |
|
|