Encore at Equinox Toronto, Ontario, Canada
Identification
Also known as - Encore at Equinox
[1]
Address - Approximately 70 Town Centre Court
[2] Postal Code - M1P 0B2
[2]
Fronts - Highway 401
, and McCowan Road
Neighbourhood - Bendale
City -
Toronto, Ontario, Canada
Urban Agglomeration -
Greater Golden Horseshoe
Cluster -
Equinox
Nearby Buildings - Eq1, Forest Vista, Equinox - East Tower, Equinox - West Tower, Centro - Structure 1, Red at Equinox, Centro - Structure 2, Canada Life Centre, Eq2, and Canada Centre Nearby Parks - Albert Campbell Square
, Frank Faubert Park
, Hillsborough Park
, North Bendale Park
, and Scarborough Civic Centre
Ward - Scarborough Centre (38)
Technical
Type - Skyscraper Designation - Residential Condominium
[2] [3] [4] Status - Construction Floors Above-Ground - 39
[2] [3] [6] Floors Below-Ground - 3
[2] [7] [8] Residential Suite Count - 403
[2] [6] [7] Residential Suite Maxsize - 86.86m² (935f²)
[9] Residential Suite Minsize - 57.41m² (618f²)
[9]
Amenities - Car Wash Bay
[3], Concierge
[3], Fitness Facilities
[3] [8], Games Room
[3], Guest Suite
[3], Multimedia Room
[3] [8], Events Room
[3] [8], and Vehicle Share
[9]
Companies Architect -
Graziani + Corazza Architects
[2] [7] [8] Concrete SubContractor -
Dufferin Custom Concrete Grp
[2] [7] [8] Developer -
Monarch Group
[2] [3] [4] Developer -
The Goldman Group
[3] [4] [7] Electrical Contractor -
Mayfair Electric
[2] Electrical Engineering -
United Engineering
[2] [8] Elevator Contractor -
ThyssenKrupp Elevator Can Ltd
[2] Excavating Contractor -
Michael Bros Excavating
[2] [7] [8] Formwork Contractor -
Consolidated 2000
[8] Foundation Contractor -
Anchor Shoring & Caissons Ltd
[2] General Contractor -
Monarch Group
[2] HVAC Contractor -
Cooltech Air Systems
[2] [8] Mechanical Engineering -
United Engineering
[2] [8] Plumbing Contractor -
Network Mechanical Inc.
[2] [8] Reinforcing Steel Contractor -
Salit Steel Niagara Ltd
[2] [7] [8] Shoring Consultants -
Anchor Shoring & Caissons Ltd
[7] Structural Engineering -
GENIVAR Consulting Group Inc.
[2] [7] [8] Windows-Glass-Glazing -
Primeline Windows Inc
[7] [8] Building Record History 2013 - Estimated Occupancy
[2] [7] [8] 2010 - Construction
[8] 2010 - Excavation
[2] [7] 2004 - Proposed
[2]
References
- 2012-04-01:
HomeGuides, Condo Builders Annual, "2012 Edition"
- 2011-04-15:
Reed Construction Data, "Encore at Equinox, 70 Town Centre Court, McCowan Rd, Hwy 401, M1C"
- 2010-04-10:
HomeGuides, CondoGuide - The GTA Edition, "Ultra-Luxury at your doorstep", page(s) 20
- 2010-05-25:
Condo Life, "June 2010 Edition"
- 2010-07-01:
Condo Life, "July 2010 Edition"
- 2010-12-03:
The Toronto Star, YourHome.ca, "Condos on the market: GTA East"
- 2011-03-16:
Reed Construction Data, Daily Commercial News and Construction Record, "Work continues on the Encore at Equinox Condos in Toronto"
- 2011-04-28:
Reed Construction Data, Daily Commercial News and Construction Record, "Monarch continues work on Encore at Equinox Condos in Toronto"
- 2011-10-03:
National Post, "For Sale: Encore at Equinox"
|