Encore at Equinox
Toronto, Ontario, Canada

Identification

Also known as - Encore at Equinox [1]

Address -  Approximately 70 Town Centre Court [2]

Postal Code - M1P 0B2 [2]

Fronts -  Highway 401 , and McCowan Road

Neighbourhood -  Bendale

City -  Toronto, Ontario, Canada

Urban Agglomeration -  Greater Golden Horseshoe

Cluster -  Equinox

Nearby Buildings -  Eq1, Forest Vista, Equinox - East Tower, Equinox - West Tower, Centro - Structure 1, Red at Equinox, Centro - Structure 2, Canada Life Centre, Eq2, and Canada Centre

Nearby Parks - Albert Campbell Square , Frank Faubert Park , Hillsborough Park , North Bendale Park , and Scarborough Civic Centre

Ward - Scarborough Centre (38)

Technical

Type -  Skyscraper

Designation - Residential Condominium [2] [3] [4]

Status - Construction

Floors Above-Ground - 39 [2] [3] [6]

Floors Below-Ground - 3 [2] [7] [8]

Residential Suite Count - 403 [2] [6] [7]

Residential Suite Maxsize - 86.86m² (935f²) [9]

Residential Suite Minsize - 57.41m² (618f²) [9]

Amenities - Car Wash Bay [3], Concierge [3], Fitness Facilities [3] [8], Games Room [3], Guest Suite [3], Multimedia Room [3] [8], Events Room [3] [8], and Vehicle Share [9]

Companies

Architect - Graziani + Corazza Architects [2] [7] [8]

Concrete SubContractor - Dufferin Custom Concrete Grp [2] [7] [8]

Developer - Monarch Group [2] [3] [4]

Developer - The Goldman Group [3] [4] [7]

Electrical Contractor - Mayfair Electric [2]

Electrical Engineering - United Engineering [2] [8]

Elevator Contractor - ThyssenKrupp Elevator Can Ltd [2]

Excavating Contractor - Michael Bros Excavating [2] [7] [8]

Formwork Contractor - Consolidated 2000 [8]

Foundation Contractor - Anchor Shoring & Caissons Ltd [2]

General Contractor - Monarch Group [2]

HVAC Contractor - Cooltech Air Systems [2] [8]

Mechanical Engineering - United Engineering [2] [8]

Plumbing Contractor - Network Mechanical Inc. [2] [8]

Reinforcing Steel Contractor - Salit Steel Niagara Ltd [2] [7] [8]

Shoring Consultants - Anchor Shoring & Caissons Ltd [7]

Structural Engineering - GENIVAR Consulting Group Inc. [2] [7] [8]

Windows-Glass-Glazing - Primeline Windows Inc [7] [8]

Building Record History

2013 - Estimated Occupancy [2] [7] [8]

2010 - Construction [8]

2010 - Excavation [2] [7]

2004 - Proposed [2]

References

  1. 2012-04-01: HomeGuides, Condo Builders Annual, "2012 Edition"
  2. 2011-04-15: Reed Construction Data, "Encore at Equinox, 70 Town Centre Court, McCowan Rd, Hwy 401, M1C"
  3. 2010-04-10: HomeGuides, CondoGuide - The GTA Edition, "Ultra-Luxury at your doorstep", page(s) 20
  4. 2010-05-25: Condo Life, "June 2010 Edition"
  5. 2010-07-01: Condo Life, "July 2010 Edition"
  6. 2010-12-03: The Toronto Star, YourHome.ca, "Condos on the market: GTA East"
  7. 2011-03-16: Reed Construction Data, Daily Commercial News and Construction Record, "Work continues on the Encore at Equinox Condos in Toronto"
  8. 2011-04-28: Reed Construction Data, Daily Commercial News and Construction Record, "Monarch continues work on Encore at Equinox Condos in Toronto"
  9. 2011-10-03: National Post, "For Sale: Encore at Equinox"